CN / EN

  • Home

  • About us

    About us

    Development history

    Corporate culture

    Global layout

    Social responsibility

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video

  • Workshop

    Production workshop

    Quality reality

  • Honor

    Qualification

    Enterprise Honor

  • Download

  • Application

  • News

  • Contact us

The Tuha Oilfield is accelerating efforts to advance its one million kilowatt-level new energy project.

Release time:2026-03-27 14:00:01 Clicks:


On March 24th, at the construction sites of the 1 million kilowatt wind power project in Turpan Shanshan and the 1 million kilowatt photovoltaic project in Shanshan East of the Tuha Oilfield, machines were roaring and workers were operating in an orderly manner. The construction of the two 1 million kilowatt new energy projects of the Tuha Oilfield has entered a fast lane.
Turpan is known as the "Wind Repository" and "China's Hottest Place", with natural conditions suitable for the development of wind power and photovoltaic power. The "Thirty Mile Wind Area" in Xiaocaohu has abundant wind resources throughout the year, with an average annual wind speed of over 8 meters per second and extreme gusts reaching up to level 14. It also has abundant sunlight, with over 3,200 hours of sunshine per year, making it a true "green energy treasure house".
As a key measure of China National Petroleum Corporation's new energy layout in Xinjiang, the two 1 million kilowatt new energy projects are the "highlight" of the Tuha Oilfield's transformation and development. They are scheduled to start in September and December 2025, respectively. Among them, the 1 million kilowatt wind power project in Shanshan is the first 1 million kilowatt wind power project built by China National Petroleum Corporation in Xinjiang. It will install 160 wind turbine units with a single-unit capacity of 6.25 megawatts, adopting industry-leading technology, featuring high power generation efficiency and strong stability. The 1 million kilowatt photovoltaic project in Shanshan East will use high-efficiency N-type photovoltaic modules, with about 1.9 million units planned to be installed, covering an area of approximately 29,000 mu. It will also build a 100 megawatt/200 megawatt-hour electrochemical energy storage system, and achieve full-process intelligent management through a smart operation and maintenance platform, which can significantly improve power generation efficiency and safety stability, effectively mitigate the volatility of new energy power generation, and promote the project's development towards high-end and intelligent directions.
To ensure the smooth progress and high-quality completion of the projects, the Tuha Oilfield has selected key personnel to form a project construction management department and a support and guarantee group, strengthening safety management and quality control. They have implemented a "map-based operation and node control" approach, breaking down construction tasks to the day and assigning responsibilities to individuals, ensuring that every task is well-deployed and implemented. At the same time, they have continuously optimized the construction process and fully adopted mechanized operations, effectively solving the problems of raw material supply, equipment transportation, and on-site construction, and accelerating the project's progress.
Since the "14th Five-Year Plan", the main production areas of the Tuha Oilfield have achieved full coverage of green electricity, with a cumulative self-generated green electricity of over 400 million kilowatt-hours. In 2025, the self-generated green electricity is expected to reach 157 million kilowatt-hours, accounting for nearly one-third of the oilfield's power consumption.
Currently, the construction of the two projects is proceeding as planned. After commissioning, the annual green power generation capacity will increase by over 3.3 billion kilowatt-hours, equivalent to an additional 700,000 tons of standard oil, and the annual reduction of carbon dioxide emissions will exceed 2.62 million tons. The oilfield will also transform from an oil and gas producer to an energy producer and carbon service provider.


Previous:The water heating transformation project of Jinxi Petrochemical has enhanced the comprehensive utilization efficiency of energy.
Next:Lanzhou Petrochemical Company has successfully solved the problem of processing high-sulfur crude oil.
Back to list

Take a look

  • ​On March 23, it was learned from Jinxi Petroc…
  • On March 24th, at the construction sites of the…
  • ​Lanzhou Petrochemical Company has successfull…
  • On March 5th, at the site of Well Wawa 38-39-K0…
  • ​Just after the Spring Festival, good news cam…
  • On January 21st, the Wunan 3-2-13X well of the …
  • As of December 3rd, Daqing Oilfield, the worlds…
  • On November 28th, it was learned that the Daan …
  • On November 24th, the "laser rust removal …

Product recommendation

Three piece forged steel trunnion ball valve

Three piece forged steel trunnion bal…

Cast steel ball valve

Cast steel ball valve

Stainless steel ball valve

Stainless steel ball valve

Top entry eccentric semi ball valve

Top entry eccentric semi ball valve

Side Mounted Eccentric Semi Ball Valve

Side Mounted Eccentric Semi Ball Valv…

Shanghai Rogers Valve Co.,Ltd.

No. 888 Shantong Road, Jinshan District, Shanghai

+86-21-33758111

+86-21-33758119

rovv@rovv-valve.com

www.rovv-valve.com

Quick navigation

  • About us

  • Products

  • Workshop

  • Honor

  • Download

  • Application

  • News

  • Contact us

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video


  • Copyright © 2023 Shanghai Rogers Valve Co.,Ltd..  All rights reserved. Sitemap