CN / EN

  • Home

  • About us

    About us

    Development history

    Corporate culture

    Global layout

    Social responsibility

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video

  • Workshop

    Production workshop

    Quality reality

  • Honor

    Qualification

    Enterprise Honor

  • Download

  • Application

  • News

  • Contact us

The first "scenic Firewood storage" microgrid in the second oil production plant of Changqing Oilfield was put into operation

Release time:2024-04-12 16:13:07 Clicks:

1-2.jpg


As of December 25, the first "Fengfeng Firewood storage" microgrid of the second Oil production plant of Changqing Oilfield has been put into operation for 1 month in the Mu 165 well site of Fanjiachuan operating area, and all indicators are normal. The project is the first zero-carbon well site successfully built in Changqing Oilfield and is expected to save 10.4 tons of diesel fuel per year.
"Wind fuel storage" microgrid includes photovoltaic, horizontal axis fan, vertical axis fan, energy storage battery, diesel generator. The project is designed in accordance with the off-grid mode, and in addition to photovoltaic and wind energy, it also applies the plant's first energy storage lead-acid battery. Lead-acid batteries have the advantages of low cost and high safety. The research experiment of peaking and frequency modulation in the microgrid shows that the battery can be used to generate electricity for more than 24 hours in rainy days. The standby 35 kW diesel generator can completely avoid the special situation of long-term rainy weather can not generate electricity, and keep the pumping unit normally on.
It is reported that this project is the first time that the second oil production plant has cooperated with its brother Bohai Equipment in the development and construction of new energy projects, which has practiced the concept of green and low-carbon development and has a good demonstration and leading role.


Previous:CNPC Logging completed the bridge shooting construction of the Group's first CBM electric drive fracturing platform
Next:10 problems often encountered in the use of valves
Back to list

Take a look

  • On April 20th, 72 sets of camp houses, the firs…
  • Since the beginning of the year, Daqing Drillin…
  • ​On March 23, it was learned from Jinxi Petroc…
  • On March 24th, at the construction sites of the…
  • ​Lanzhou Petrochemical Company has successfull…
  • On March 5th, at the site of Well Wawa 38-39-K0…
  • ​Just after the Spring Festival, good news cam…
  • On January 21st, the Wunan 3-2-13X well of the …
  • As of December 3rd, Daqing Oilfield, the worlds…

Product recommendation

Three piece forged steel trunnion ball valve

Three piece forged steel trunnion bal…

Cast steel ball valve

Cast steel ball valve

Stainless steel ball valve

Stainless steel ball valve

Top entry eccentric semi ball valve

Top entry eccentric semi ball valve

Side Mounted Eccentric Semi Ball Valve

Side Mounted Eccentric Semi Ball Valv…

Shanghai Rogers Valve Co.,Ltd.

No. 888 Shantong Road, Jinshan District, Shanghai

+86-21-33758111

+86-21-33758119

rovv@rovv-valve.com

www.rovv-valve.com

Quick navigation

  • About us

  • Products

  • Workshop

  • Honor

  • Download

  • Application

  • News

  • Contact us

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video


  • Copyright © 2023 Shanghai Rogers Valve Co.,Ltd..  All rights reserved. Sitemap